Location: Nevada
Description: Sturgeon Electric is finishing up work on the 60-mile, Harry Allen – El Dorado 500kV project in Clark County, Nevada for DesertLink, LLC., an LS Power company. The line traverses Bureau of Land Management (BLM) and Bureau of Reclamation property and connects NV Energy’s Harry Allen substation with the Eldorado substation, operated by Southern California Edison. The scope of work included building foundations, installing anchors, and assembling several lattice towers along with pulling triple bundle wire over multiple crossings in a very crowded corridor.
Completion Date: March 2020
Work Performed By: Sturgeon Electric Company, Inc., a subsidiary of MYR Group
Client: DesertLink, LLC., an LS Power company