Location: Utah
Description: Under this design/build alliance, MYR Group’s subsidiary Sturgeon Electric Company, Inc. performed major upgrades to 138kV/46kV systems, constructed 30+ new Greenfield substations and substation additions ranging from 345kV-138kV to 138kV-12kV, and new construction, additions and rebuilds of overhead and underground distribution lines and transmission lines. The scope also included construction of fiber optic communication network between substations.
Completed: 2003 through 2005
Work Performed By: Sturgeon Electric Company, Inc., a subsidiary of MYR Group
Client: PacifiCorp